Installation Process

Installation Process

Installation Process – MetroNYInsulation
TenMat recessed light cover. This is our preferred method and product used in attic installations.
TenMat recessed light cover. This is our preferred method and product used in attic installations.
Foam Sealing a Tenmat Recessed Light Cover at Bottom and Top prior to Cellulose Installation.
Foam Sealing a Tenmat Recessed Light Cover at Bottom and Top prior to Cellulose Installation.
Ross - Dense Packing a Wall
Ross – Dense Packing a Wall
Concrete Shingle behind the vinyl siding to be hammered away to drill hole.
Concrete Shingle behind the vinyl siding to be hammered away to drill hole.
2 9/16" Hole drilled into home
2 9/16" Hole drilled into home
Stud Cavity Dense Packed with Cellulose
Stud Cavity Dense Packed with Cellulose
Holes Drilled into a course of siding awaiting insulation
Holes Drilled into a course of siding awaiting insulation
Pre-Dense Pack Installation Hole Drilling
Pre-Dense Pack Installation Hole Drilling
Exterior holes filled waiting for pine plugs
Exterior holes filled waiting for pine plugs
Drilling a hole into stud cavity
Drilling a hole into stud cavity
Drilling Hole into clapboard siding
Drilling Hole into clapboard siding
Ross Dense Packing a Wall in Fishkill, NY
Ross Dense Packing a Wall in Fishkill, NY
 


Page:   1 2 3 4

 

Valid XHTML 1.0 Transitional     © 2014 Metro NY Insulation — All Rights Reserved.